Failure to correct cracked or loose plaster, holes, decayed wood, water damage and/or other defective surface conditions
avg $6256×
+ I can confirm this is still happening
Show details · 6 occurrences
· $3,750 in fines
May 14, 2025$625CAP 25NOIR-INS-04734BathroomBasement
May 14, 2025$625CAP 25NOIR-INS-04734DenBasement
May 14, 2025$625CAP 25NOIR-INS-04734KitchenBasement
+3 more
May 14, 2025$625CAP 25NOIR-INS-04734Sleeping RoomBasement
Mar 3, 2025$625CAP 25NOIR-INS-03014HallwayInterior
Mar 3, 2025$625CAP 25NOIR-INS-03014Sleeping room 1Interior
IPMC § 605.1
Failure to install electrical equipment, wiring, or appliances in a safe and approved manner
+ I can confirm this is still happening
Show details · 1 occurrence
· $625 in fines
May 14, 2025$625CAP 25NOIE-INS-03639BasementBasement
IPMC § 502.1
Failure to maintain bathtub, shower, lavatory, water closet or kitchen sink in a sanitary, safe working condition
+ I can confirm this is still happening
Show details · 1 occurrence
· $625 in fines
May 14, 2025$625CAP 25NOIR-INS-04734Bathroom1
IPMC § 305.1
Failure to maintain interior of structure and equipment therein in good repair, structurally sound and in sanitary condition
+ I can confirm this is still happening
Show details · 1 occurrence
· $1,249 in fines
May 14, 2025$1,249CAP 25NOIR-INS-04734Kitchen1
IPMC § 702.3
Failure to make all means of egress doors readily openable from the side from which egress is to be made without the need for keys, special knowledge or effort
+ I can confirm this is still happening
Show details · 1 occurrence
· $2,499 in fines
Mar 3, 2025$2,499CAP 25NOIE-INS-02276Apartment Entrance DoorInterior
Show 3 more violation types
IPMC § 305.6
Failure to maintain interior doors that fit reasonably well within the frame
+ I can confirm this is still happening
Show details · 1 occurrence
· $125 in fines
Mar 3, 2025$125CAP 25NOIR-INS-03014Apartment Entrance DoorInterior
Failure to install or maintain single- or multiple-station smoke alarms in Group I-1 and R occupancies, and dwellings not regulated as Group R occupancies, regardless of occupant load on the ceiling or wall outside of each separate s